Showing 51 - 60 of 78
Persistent link: https://www.econbiz.de/10012265203
Persistent link: https://www.econbiz.de/10012064992
Persistent link: https://www.econbiz.de/10011825549
Persistent link: https://www.econbiz.de/10011978869
Persistent link: https://www.econbiz.de/10011978872
Persistent link: https://www.econbiz.de/10011978877
Persistent link: https://www.econbiz.de/10011978885
Persistent link: https://www.econbiz.de/10011997083
This paper is devoted to the calculation of the stability radius of an optimal schedule for a job shop problem, when the objective is to minimize mean or maximum flow times. The approach used may be regarded as an a posteriori analysis, in which an optimal schedule has already been constructed...
Persistent link: https://www.econbiz.de/10005336354
Persistent link: https://www.econbiz.de/10005257120