Showing 1 - 10 of 48
Persistent link: https://www.econbiz.de/10007181155
This research is a further development of our recent papers [2, 3]. A production system produces a given target amount by a given due date and has several possible speeds which are subject to random disturbances. The system's output can be measured only at present inspection (control) points....
Persistent link: https://www.econbiz.de/10010749914
Persistent link: https://www.econbiz.de/10005311966
Persistent link: https://www.econbiz.de/10007308700
Persistent link: https://www.econbiz.de/10011751190
Persistent link: https://www.econbiz.de/10007346010
Persistent link: https://www.econbiz.de/10007362162
Persistent link: https://www.econbiz.de/10008798707
Persistent link: https://www.econbiz.de/10009568725
Persistent link: https://www.econbiz.de/10009242302