Showing 261 - 270 of 270
Persistent link: https://www.econbiz.de/10006823101
Persistent link: https://www.econbiz.de/10006287919
Persistent link: https://www.econbiz.de/10006289593
Purpose – The purpose of this paper is to solve a flexible job shop scheduling problem where alternate machines are available to process the same job. The study considers the Flexible Job Shop Problem (FJSP) having n jobs and more than three machines for scheduling. Design/methodology/approach...
Persistent link: https://www.econbiz.de/10014839847
Purpose – The purpose of the paper is to analyze the effect on centralized dispatching generation cost under the condition where the single‐buyer electric supply industry (ESI) with independent power producer (IPP) scheme (the ESI structure that is widely implemented in developing countries)...
Persistent link: https://www.econbiz.de/10014773502
Persistent link: https://www.econbiz.de/10015062845
Persistent link: https://www.econbiz.de/10003798705
Persistent link: https://www.econbiz.de/10015083733
Persistent link: https://www.econbiz.de/10011914620
Persistent link: https://www.econbiz.de/10009782189