Showing 21 - 30 of 123
Persistent link: https://www.econbiz.de/10009573362
Persistent link: https://www.econbiz.de/10009503878
Persistent link: https://www.econbiz.de/10009548868
Persistent link: https://www.econbiz.de/10009388396
We consider the problem of scheduling a set of equal-processing-time jobs with arbitrary job sizes on a set of batch machines with different capacities. A job can only be assigned to a machine whose capacity is not smaller than the size of the job. Our goal is to minimize the schedule length...
Persistent link: https://www.econbiz.de/10010906446
We consider the problem of scheduling a set of n jobs with arbitrary job sizes on a set of m identical and parallel batch machines so as to minimize the makespan. Motivated by the computational complexity of the problem, we propose a meta-heuristic based on the max–min ant system method....
Persistent link: https://www.econbiz.de/10010939779
Persistent link: https://www.econbiz.de/10005330055
Persistent link: https://www.econbiz.de/10005337387
Consider m identical machines in parallel, each of which can produce k different product types. There is no setup cost when the machines switch from producing one product type to another. There are n orders each of which requests various quantities of the different product types. All orders are...
Persistent link: https://www.econbiz.de/10005337883
Persistent link: https://www.econbiz.de/10005347306