Showing 1 - 10 of 138
Persistent link: https://www.econbiz.de/10003922347
Persistent link: https://www.econbiz.de/10008895194
We consider the control of a manufacturing system responding to planned demand at the end of the expected life of each individual piece of equipment and unplanned demand triggered by a major equipment failure. The difficulty of controlling this type of production system resides in the variable...
Persistent link: https://www.econbiz.de/10005066842
Persistent link: https://www.econbiz.de/10008779651
Persistent link: https://www.econbiz.de/10008779612
Persistent link: https://www.econbiz.de/10009490288
Persistent link: https://www.econbiz.de/10009770117
Persistent link: https://www.econbiz.de/10010383897
Persistent link: https://www.econbiz.de/10011444049
Persistent link: https://www.econbiz.de/10011475716