Showing 1 - 10 of 9,692
utilities must perform under regulatory frameworks based on performance (Performance Based Regulation or PBR). The proposal is …
Persistent link: https://www.econbiz.de/10005543676
Persistent link: https://www.econbiz.de/10011510194
Persistent link: https://www.econbiz.de/10011446455
The challenges of implementing circular supply chains (CSCs) are well documented, but their characterization in public sector supply chains is unavailable. Thus, this paper closes such a gap by viewing it as a multiple criteria sorting (MCS) problem. Following a systematic literature review of...
Persistent link: https://www.econbiz.de/10014245368
Persistent link: https://www.econbiz.de/10011667801
The integration of Distributed Generation (DG) into distribution grid systems introduces problems in network operation, control and protection. Key issues associated with DG inclusion are voltage or current control, cost-effective operation, protection coordination and network transients. Better...
Persistent link: https://www.econbiz.de/10010670022
Persistent link: https://www.econbiz.de/10010233233
Persistent link: https://www.econbiz.de/10011671672
Persistent link: https://www.econbiz.de/10012153803
Persistent link: https://www.econbiz.de/10012155446