Showing 211 - 220 of 270
This study addresses the pre-acquisition financial characteristics of privately held acquiring and acquired companies involved in 143 Belgian takeovers between 1992 and 1994. Specifically, the research examines the profitability, liquidity, financial structure, added value and failure risk using...
Persistent link: https://www.econbiz.de/10005607036
Complex technologies develop within technological systems, which include, in addition to discrete technologies, organizations such as manufacturing firms and investment banks; scientific elements, such as teaching and research programs; and legislative elements, such as regulations. The tangible...
Persistent link: https://www.econbiz.de/10005607037
We present a finite capacity production scheduling algorithm for an integrated steel company located in Belgium. This multiple-objective optimization model takes various case-specific constraints into account and consists of two steps. A machine assignment step determines the routing of an...
Persistent link: https://www.econbiz.de/10005607038
Resource-constrained project scheduling with activity pre-emption assumes that activities are allowed to be interrupted and restarted later in the schedule at no extra cost. In the current paper, we extend this pre-emptive scheduling problem with setup times between activity interruptions and...
Persistent link: https://www.econbiz.de/10005607039
Using a unique methodological approach, we examine factors related to venture capital firms’ (VCFs’) involvement in syndication. We argue that VCFs’ investment strategy matters in terms of the extent to which VCFs engage in syndication. We test several hypotheses pertaining...
Persistent link: https://www.econbiz.de/10005607040
This article traces the changing impact of national differences on the geographical and industry diversification strategy of leading firms in Europe in 1987-2000, a period of intensified European integration. The results indicate that, whereas country of origin had a significant effect at the...
Persistent link: https://www.econbiz.de/10005607041
Few studies have addressed the pre-take-over financial characteristics of multiple versus single acquirers and their targets. Therefore this study investigates whether multiple acquirers, with some experience in acquiring companies, might acquire firms with different (better) financial...
Persistent link: https://www.econbiz.de/10005607042
There is no consensus on the construct project performance. This article examines how to suitably operationalise project performance as it is viewed by practitioners. An alternative research approach, based on the repertory grid method, was used in combination with a survey to develop a...
Persistent link: https://www.econbiz.de/10005607043
Competitive strategy is at the heart of the field of strategic management. But despite years of academic research, there is a lot of debate about what constitutes competitive strategy and how effective competitive strategies lead to superior performance. In this article, we argue that strategy...
Persistent link: https://www.econbiz.de/10005607044
In this paper we introduce the concept of due date assignment in the project scheduling literature. Despite the fact that due date assignment problems belongs to the core of the machine scheduling literature, no attempts have been made to tackle this problem in a project scheduling environment....
Persistent link: https://www.econbiz.de/10005607045