Showing 1 - 10 of 114
Persistent link: https://www.econbiz.de/10003959947
It is known that the single machine scheduling problem of minimizing the number of tardy jobs is polynomially solvable. However, it becomes NP-hard if each job has a deadline. Recently, Huo et al. solved some special cases by a backwards scheduling approach. In this note we present a dual...
Persistent link: https://www.econbiz.de/10008483344
Persistent link: https://www.econbiz.de/10008349201
Persistent link: https://www.econbiz.de/10011987052
Persistent link: https://www.econbiz.de/10010490683
Persistent link: https://www.econbiz.de/10003903720
Persistent link: https://www.econbiz.de/10003773711
Persistent link: https://www.econbiz.de/10005240854
Persistent link: https://www.econbiz.de/10006641558
In this paper, the problem of minimizing maximum cost and makespan simultaneously on an unbounded parallel-batching machine is considered. An unbounded parallel-batching machine is a machine that can handle any number of jobs in a batch and the processing time of a batch is the largest...
Persistent link: https://www.econbiz.de/10010888467