Showing 1 - 10 of 244
Persistent link: https://www.econbiz.de/10008988740
Persistent link: https://www.econbiz.de/10009766188
Persistent link: https://www.econbiz.de/10009682513
Persistent link: https://www.econbiz.de/10005318207
This study deals with Material Requirement Planning (MRP) software parameterization under uncertainties. The actual lead time has random deviations; so it can be considered as a random variable. MRP approach with Periodic Order Quantity (POQ) policy is considered. The aim is to find the optimal...
Persistent link: https://www.econbiz.de/10010869112
Persistent link: https://www.econbiz.de/10010102417
Persistent link: https://www.econbiz.de/10010026998
Persistent link: https://www.econbiz.de/10008089960
Persistent link: https://www.econbiz.de/10008880338
The problem of MRP offsetting for assembly systems with random component procurement times is considered. POQ policy is used for the case where all components have identical lead time distributions and holding costs. An analytical optimization model is proposed and solved. This model minimizes...
Persistent link: https://www.econbiz.de/10010580555