Showing 1 - 10 of 278
Persistent link: https://www.econbiz.de/10003841034
We study the multi-item economic lot scheduling problem (ELSP) with two sources of production: manufacturing of new items and remanufacturing of returned items. Manufacturing and remanufacturing operations are performed on the same production line. Tang and Teunter [2006. Economic lot scheduling...
Persistent link: https://www.econbiz.de/10005318233
We study the economic lot scheduling problem with two production sources, manufacturing and remanufacturing, for which operations are performed on separate, dedicated lines. We develop an exact algorithm for finding the optimal common-cycle-time policy. The algorithm combines a search for the...
Persistent link: https://www.econbiz.de/10005151531
Persistent link: https://www.econbiz.de/10008225887
Persistent link: https://www.econbiz.de/10008065289
Persistent link: https://www.econbiz.de/10003314377
Purpose – The UK Chinook helicopter is a utility and attack helicopter being operated by the Royal Air Force (RAF). Its versatile nature is of enormous importance to the strategic capability of the RAF's operations. The purpose of this paper is to utilise systems-based forecasting to conduct...
Persistent link: https://www.econbiz.de/10009433482
Persistent link: https://www.econbiz.de/10003769460
Persistent link: https://www.econbiz.de/10009546531
Persistent link: https://www.econbiz.de/10009405550