Showing 1 - 10 of 19
Persistent link: https://www.econbiz.de/10004257153
Persistent link: https://www.econbiz.de/10004263803
Persistent link: https://www.econbiz.de/10004356114
Persistent link: https://www.econbiz.de/10003328631
Persistent link: https://www.econbiz.de/10008798023
Persistent link: https://www.econbiz.de/10009627258
Persistent link: https://www.econbiz.de/10001572522
Persistent link: https://www.econbiz.de/10011882595
In this paper a discrete-continuous project scheduling problem is considered. In this problem activities simultaneously require discrete and continuous resources. The processing rate of each activity depends on the amount of the continuous resource allotted to this activity at a time. All the...
Persistent link: https://www.econbiz.de/10010999772
The Liu-Layland periodic scheduling problem can be solved by the house monotone quota methods of apportionment. This paper shows that staying within the quota is necessary for any apportionment divisor method to solve this problem. As a consequence no divisor method, or equivalently no...
Persistent link: https://www.econbiz.de/10005253070