Showing 1 - 10 of 74
Persistent link: https://www.econbiz.de/10004593671
Persistent link: https://www.econbiz.de/10004038165
Persistent link: https://www.econbiz.de/10001365836
Persistent link: https://www.econbiz.de/10014559792
Persistent link: https://www.econbiz.de/10011817510
Persistent link: https://www.econbiz.de/10011817516
Persistent link: https://www.econbiz.de/10011817517
Most scheduling problems are notoriously intractable, so the majority of algorithms for them are heuristic in nature. Priority rule-based methods still constitute the most important class of these heuristics. Of these, in turn, parameterized biased random sampling methods have attracted...
Persistent link: https://www.econbiz.de/10011558730
Most scheduling problems are notoriously intractable, so the majority of algorithms for them are heuristic in nature. Priority rule-based methods still constitute the most important class of these heuristics. Of these, in turn, parameterized biased random sampling methods have attracted...
Persistent link: https://www.econbiz.de/10011558731
It is well-known that for many project scheduling problems the Space AS of active schedules contains at least one optimal solution for each feasible instance, so restricting heuristic construction methods to AS will improve algorithmic efficiency without foresaking the chance to eventually find...
Persistent link: https://www.econbiz.de/10011558742