Showing 31 - 40 of 43
Customer service has assumed strategic importance in most manufacturing environments. Corporate reputations often depend on how reliably promised lead times are met. A goal of filling orders within a service window of T time units is often encountered in practice. This goal ignores the...
Persistent link: https://www.econbiz.de/10009204531
This paper introduces a line of research on capacity-constrained multi-stage production scheduling problems. The first section introduces the problem area as it arises from a failure of MRP systems. Then a review of the literature and an analysis of the type of problems that exist are presented...
Persistent link: https://www.econbiz.de/10009208431
Persistent link: https://www.econbiz.de/10006026637
Persistent link: https://www.econbiz.de/10010096869
Persistent link: https://www.econbiz.de/10013475031
Persistent link: https://www.econbiz.de/10008477024
Persistent link: https://www.econbiz.de/10005414266
This research focuses on the effect of setup time on lot sizing. The setting is the Capacitated Lot Sizing Problem (the single-machine lot sizing problem) with nonstationary costs, demands, and setup times. A Lagrangian relaxation of the capacity constraints of CLSP allows it to be decomposed...
Persistent link: https://www.econbiz.de/10009191407
This paper concerns the modeling of low inventory lines. Currently, most models assume that processing times are independent. We consider the differences in behavior of workers in low- and high-inventory production lines. Using a laboratory experiment we show that workers speed up when they are...
Persistent link: https://www.econbiz.de/10009191474
In practice, most multi-echelon inventory systems are managed using adaptations of single location methods. This paper shows that such methods can be dramatically inferior to methods designed to take advantage of a system's structure. This is especially true in repair parts inventory systems...
Persistent link: https://www.econbiz.de/10009191649