Recent research studies of job shop scheduling have begun to examine the interaction between sequencing priorities and the method of assigning due-dates. This paper surveys the tactical aspects of this interaction, focusing primarily on average tardiness as a measure of scheduling effectiveness....
Persistent link: https://www.econbiz.de/10009214444
A collection of stochastic jobs is to be processed by a single machine in a manner which is consistent with a precedence relation on the job set. Costs are incurred as jobs are processed and rewards are earned when they complete. The problem of finding optimal processing strategies is in general...
Persistent link: https://www.econbiz.de/10009203854
In this paper we consider a class of job shops with a dispatch area and a machine shop, where operational controls are exercised at the dispatch area as well as at the machine shop. For such dynamic job shops with these two levels of control, there are three categories of models. They are (1)...
Persistent link: https://www.econbiz.de/10009204560
We consider the problem of smoothing production in a job shop in which all production is to customer order and the demand process is a stationary stochastic process. We present an approach to production smoothing based on the concept of a planning window. A planning window is the difference...
Persistent link: https://www.econbiz.de/10009208488
In 1973, Balut gave an algorithm to solve an n-job one machine scheduling problem in which processing times are random variables and the objective is to minimize the number of tardy jobs with a specified certainty level. This note, however, presents an example for which his algorithm fails to...
Persistent link: https://www.econbiz.de/10009208800
Improved priority scheduling rules are presented for a repair shop supporting a multi-item repairable inventory system with a hierarchical product structure. A variety of scheduling rules are evaluated using a simulation of a representative shop and product structure. The results indicate that...
Persistent link: https://www.econbiz.de/10009191176
This paper is concerned with the study of the constant due-date assignment policy in a dynamic job shop. Assuming that production times are randomly distributed, each job has a penalty cost that is some non-linear function of its due-date and its actual completion time. The due date is found by...
Persistent link: https://www.econbiz.de/10009197997
This paper reassess modern day decision-making processes for healthier Asian economies by systematically unpacking and critiquing key assumptions that drive organisational communication and cultural systems in contemporary Asia. The term non-Western refers to interests of Asian economies and...
Persistent link: https://www.econbiz.de/10009483319
Persistent link: https://www.econbiz.de/10009381079
Persistent link: https://www.econbiz.de/10011373440