Showing 1 - 10 of 6,641
Companies typically plan for warranty costs through creation of a reserve fund. Most researchers assume that the warranty reserve is set based on the expected total warranty costs. However, companies rarely keep reserves to cover their liabilities for the whole life of their products, since...
Persistent link: https://www.econbiz.de/10009352549
Since the early 1980s, the econometric analysis of duration variables has become widespread. This chapter provides an overview of duration analysis, with an emphasis on the specification and identification of duration models, and with special attention to models for multiple durations. Most of...
Persistent link: https://www.econbiz.de/10014024985
Persistent link: https://www.econbiz.de/10011563134
Persistent link: https://www.econbiz.de/10010338533
Persistent link: https://www.econbiz.de/10011422574
This paper is a comprehensive study of methods for assessing unidimensional expected utility functions. The paper … describes the utility assessment process in decision analysis and then reviews problem formulation, sources of bias in … preference judgments, and the analysis of risk attitudes. Two dozen utility assessment methods of which half appear for the first …
Persistent link: https://www.econbiz.de/10009204102
Persistent link: https://www.econbiz.de/10011349550
Persistent link: https://www.econbiz.de/10011979528
Persistent link: https://www.econbiz.de/10012102572
Persistent link: https://www.econbiz.de/10012108745