Showing 1 - 10 of 145
Persistent link: https://www.econbiz.de/10009569596
Persistent link: https://www.econbiz.de/10010243957
Persistent link: https://www.econbiz.de/10009657204
Persistent link: https://www.econbiz.de/10009315629
Persistent link: https://www.econbiz.de/10011645248
Persistent link: https://www.econbiz.de/10011989176
Persistent link: https://www.econbiz.de/10009979078
Persistent link: https://www.econbiz.de/10009820182
In the no-idle flowshop, machines cannot be idle after finishing one job and before starting the next one. Therefore, start times of jobs must be delayed to guarantee this constraint. In practice machines show this behavior as it might be technically unfeasible or uneconomical to stop a machine...
Persistent link: https://www.econbiz.de/10010738089
Flowshop scheduling is a very active research area. This problem still attracts a considerable amount of interest despite the sheer amount of available results. Total flowtime minimization of a flowshop has been actively studied and many effective algorithms have been proposed in the last few...
Persistent link: https://www.econbiz.de/10010597618