We study round-robin tournaments for 2n teams. Here n is either interpreted as the number of clubs, each having two teams, or the number of strength groups with two teams each. For even n we give a construction of a Single round-robin tournament for 2n teams with 2n - 2 breaks, where the teams...
Persistent link: https://www.econbiz.de/10011558719
We consider a project scheduling problem where the precedence constraints graph is an out-tree. The processing times can be compressed by using additional resources, which causes cost and simultaneously reduces the processing times of jobs. The objective is to minimize the sum of total lateness...
Persistent link: https://www.econbiz.de/10011558722
Over the years numerous branch-and-bound procedures for solving the resource-constrained project scheduling problem have been developed. Enumerating delaying alternatives, extension alternatives, feasible posets, feasible sequences or feasible subsets, they all aim at finding as fast as possible...
Persistent link: https://www.econbiz.de/10011558725
The problem of scheduling multiple, large scale, make-to-order assemblies is considered. Beside "classical" precedence- and resource constraints as known from resource constrained project scheduling we take spatial resource and part availability constraints into account. The objective is to...
Persistent link: https://www.econbiz.de/10011558728
Persistent link: https://www.econbiz.de/10011558729
Most scheduling problems are notoriously intractable, so the majority of algorithms for them are heuristic in nature. Priority rule-based methods still constitute the most important class of these heuristics. Of these, in turn, parameterized biased random sampling methods have attracted...
Persistent link: https://www.econbiz.de/10011558730
Most scheduling problems are notoriously intractable, so the majority of algorithms for them are heuristic in nature. Priority rule-based methods still constitute the most important class of these heuristics. Of these, in turn, parameterized biased random sampling methods have attracted...
Persistent link: https://www.econbiz.de/10011558731
We consider the problem of scheduling multiple, large-scale, make-to-order assemblies under resource, assembly area, and part availability constraints. Such problems typically occur in the assembly of high volume, discrete make-to-order products. Based on a list scheduling procedure which has...
Persistent link: https://www.econbiz.de/10011558732
In this paper we present a polynomial time dynamic programming algorithm for solving a scheduling problem with a (total) weighted completion time objective function where the weights are activity- and time-dependent. We highlight application areas for this type of problem to underscore the...
Persistent link: https://www.econbiz.de/10011558733
Persistent link: https://www.econbiz.de/10011558734