Showing 1 - 10 of 641,210
Persistent link: https://www.econbiz.de/10010492373
Persistent link: https://www.econbiz.de/10010234247
In this paper we present a heuristic methodology for solving resource-constrained project scheduling problems with renewable and spatial resources. We especially concentrate on spatial resources that are encountered in construction projects, but our analysis can easily be generalized to other...
Persistent link: https://www.econbiz.de/10012725657
Purpose: To develop LIRP (location-inventory-routing problem) model with considering multiple links and solve it using method of heuristic based on algorithm of simulated annealing. Method of heuristic for the LIRP model is applied in city of Jakarta to improve effectiveness and efficiency of...
Persistent link: https://www.econbiz.de/10012815015
Persistent link: https://www.econbiz.de/10012133189
Persistent link: https://www.econbiz.de/10011997367
Persistent link: https://www.econbiz.de/10010338005
Persistent link: https://www.econbiz.de/10011542092
Persistent link: https://www.econbiz.de/10011870496
Multiple production Stages -- Model reformulation & Heuristics …
Persistent link: https://www.econbiz.de/10014016730