Showing 111 - 120 of 26,172
Decisions throughout the life cycle of a building, from design through construction and commissioning to operation and …
Persistent link: https://www.econbiz.de/10009435712
The strength of a salmon run is often measured as the adult return rate from some previous brood year (i.e. the percent of a smolt population returning to spawn or captured in fisheries). The U.S. Army Corp of Engineers (ACOE) program of barge transportation of smolts from collector dams is one...
Persistent link: https://www.econbiz.de/10009435862
The primary objective of the study is to develop a computer model for a base line direct coal liquefaction design based …: a base line design based on previous DOE/PETC results from Wilsonville pilot plant and other engineering evaluations; a …
Persistent link: https://www.econbiz.de/10009435883
The primary objective of the study is to develop a computer model for a base line direct coal liquefaction design based …: a base line design based on previous DOE/PETC results from Wilsonville pilot plant and other engineering evaluations; a …
Persistent link: https://www.econbiz.de/10009435884
The Plutonium Facility, TA-55, at Los Alamos National Laboratory is currently producing NDA calibration standards used by various laboratories in the DOE complex. These NIST traceable standards have been produced to calibrate NDA instruments for accountability measurements used for resolving...
Persistent link: https://www.econbiz.de/10009435905
identify key trends related to: utilities motivations for implementing RTP, evolution of RTP tariff design, program …
Persistent link: https://www.econbiz.de/10009435945
integrating human factors as part of intelligent control systems design and implementation. It is argued that system resilience is …
Persistent link: https://www.econbiz.de/10009435962
-duration reanalysis for spacecraft design, using DREAM for real-time operations, and prospects for 1-week forecasts of the radiation belt …
Persistent link: https://www.econbiz.de/10009435966
In March, 2001, the TESLA Collaboration published its Technical Design Report (TDR, see references and links in … Design Report and the associated cost and manpower estimates. Since the elements and methodology used in producing the TESLA …
Persistent link: https://www.econbiz.de/10009435985
and standards to be applied during the design of the DST Transfer Pump Subsystem that supports the first phase of (WFD … retroactively affect previously established project design criteria without specific direction by the program. …
Persistent link: https://www.econbiz.de/10009435986