Showing 11 - 20 of 32
The Pacific Northwest Loads and Resources Study (White Book), which is published annually by the Bonneville Power Administration (BPA), establishes one of the planning bases for supplying electricity to customers. The White Book contains projections of regional and Federal system load and...
Persistent link: https://www.econbiz.de/10009436022
This Record of Decision (ROD) contains the decisions of the Administrator of the Bonneville Power Administration BPABPA with respect to the adoption of transmission and ancillary services rates for the two-year rate period beginning October 1, 2005, and ending September 30, 2007 (fiscal years...
Persistent link: https://www.econbiz.de/10009436023
Pursuant to section 300.11 of the Federal Energy Regulatory Commission's (FERC) regulations, 18 C.F.R. 300.11, the Bonneville Power Administration (BPA) submits Statements A-F as technical support for BPA's 2005 Transmission Rate filing. Each statement is preceded by an introductory discussion...
Persistent link: https://www.econbiz.de/10009436024
This publication provides detailed documentation of the load forecast scenarios and assumptions used in preparing BPA's 1991 Pacific Northwest Loads and Resources Study (the Study). This is one of two technical appendices to the Study; the other appendix details the utility-specific loads and...
Persistent link: https://www.econbiz.de/10009436068
The Federal Columbia River Power System (FCRPS), operated on behalf of the ratepayers of the PNW by BPA and other Federal agencies, faces many uncertainties during the FY 2007-2009 rate period. Among these uncertainties, the largest revolve around hydro conditions, market prices and river...
Persistent link: https://www.econbiz.de/10009436101
The RiskMod Model is comprised of a set of risk simulation models, collectively referred to as RiskSim; a set of computer programs that manages data referred to as Data Management Procedures; and RevSim, a model that calculates net revenues. RiskMod interacts with the AURORA Model, the RAM2007,...
Persistent link: https://www.econbiz.de/10009436102
The Wholesale Power Rate Development Study (WPRDS) calculates BPA proposed rates based on information either developed in the WPRDS or supplied by the other studies that comprise the BPA rate proposal. All of these studies, and accompanying documentation, provide the details of computations and...
Persistent link: https://www.econbiz.de/10009436103
Section 7(b)(2) of the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act), 16 U.S.C. {section} 839e(b)(2), directs the Bonneville Power Administration (BPA) to conduct, after July 1, 1985, a comparison of the projected rates to be charged its preference and...
Persistent link: https://www.econbiz.de/10009436104
This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test...
Persistent link: https://www.econbiz.de/10009436105
The purpose of this testimony is to provide the context and background to the financial and risk policy objectives for BPA's WP-07 Initial Proposal. The testimony contains eight sections. The first is this introduction. Section 2 provides background regarding BPA's Subscription Strategy and the...
Persistent link: https://www.econbiz.de/10009436106