Showing 41 - 50 of 8,615
mills, they require considerable engineering/capital retrofits, redesigned production methods, and thus add to overall mill … higher sulfidity cooking, without the required capital constraints for implementation. Before introduction of green liquor in …
Persistent link: https://www.econbiz.de/10009436264
-efficiency purveyor and their capital into the underlying building ownership and operation partnership, rather than the current model in … effectiveness of capital improvements aimed at reducing utility costs in commercial and residential income properties. Conventional … expertise and capital required to reduce utility operating costs. Profit to all partners increases considerably as a result …
Persistent link: https://www.econbiz.de/10009436516
management strives to minimize operating costs and optimize profit, and labor, capital and energy are potential substitutes in …
Persistent link: https://www.econbiz.de/10009437089
This report documents trends in U.S. venture capital investments over the period 1980 through the second quarter of … calendar year 2010 (2010Q1+Q2). Particular attention is given to U.S. venture capital investments in the energy … period 1995-2010Q1+Q2. During the early 1980s, U.S. venture capital investments in the energy/industrial sector accounted for …
Persistent link: https://www.econbiz.de/10009437336
tradeoffs between plant performance and capital costs are illustrated. The independent review and analysis of the expected costs … of construction, operation and maintenance of the Heber Binary Cycle Geothermal Power Demonstration Plant are described …, (2) well field development costs, (3) fluid purchase costs, and (4) well field and power plant operation and maintenance …
Persistent link: https://www.econbiz.de/10009436312
Where review of government policies followed in charging interest on unrepaid investment (32% of total program cost) disclosed those interest rates were less than cost to the US Treasury to borrow funds to finance federal programs, IG recommended consideration of policy changes to recover...
Persistent link: https://www.econbiz.de/10009437180
The impacts of completion practices on production and maintenance costs are considered. To evaluate alternative …
Persistent link: https://www.econbiz.de/10009437292
power plants needed to reach the electrical generation capacity of the steam resource in The Geysers. The report also … projects the cumulative number of workers needed to develop the steam field and to construct, operate, and maintain these power … resulting from increases in local road maintenance and school enrollment attributable to geothermal development. Several …
Persistent link: https://www.econbiz.de/10009437374
Total Flow and double flash systems have capital costs of $1,135 and $1,026 /kW with energy costs of 40.9 and 39.7 mills … flash binary system, with capital cost of $1,343 /kW and energy cost of 46.9 mills/kW h, is significantly more expensive. If …
Persistent link: https://www.econbiz.de/10009435471
technology). That translates to steam or hot water over 300{degrees}F. Local economical impacts include direct, indirect, and …
Persistent link: https://www.econbiz.de/10009435651