Showing 121 - 130 of 133
Persistent link: https://www.econbiz.de/10014448179
We present a two-stage scheduling approach including proactive and reactive scheduling to solve the ground resource scheduling problem with uncertain arrival time. In the first stage, an integer programming model is constructed to minimize the delay and transfer costs. After solving this model,...
Persistent link: https://www.econbiz.de/10014448622
Persistent link: https://www.econbiz.de/10014304607
Persistent link: https://www.econbiz.de/10013469982
Persistent link: https://www.econbiz.de/10014526938
Persistent link: https://www.econbiz.de/10014531253
Persistent link: https://www.econbiz.de/10005445292
In this paper, we present a new macro model which involves the effects that the probability of traffic interruption has on the car-following behavior through formulating the inner relationship between micro and macro variables. Linear stability analysis shows that consideration of the traffic...
Persistent link: https://www.econbiz.de/10011062192
Persistent link: https://www.econbiz.de/10015048078
The plasma produced by Dielectric Barrier Discharge (DBD) has a very important application in the field of aerodynamics. The plasma generator needs high-voltage and high-frequency power supply. Due to the existence of internal resistance of the power supply, the impedance characteristics of the...
Persistent link: https://www.econbiz.de/10012179471