Showing 1 - 10 of 36
This paper focuses on the flow shop sequence dependent group scheduling (FSDGS) problem with minimisation of total completion time as the criterion (Fm|f<SUB align="right"><SMALL>mls</SMALL></SUB>, prmu, S<SUB align="right"><SMALL>plk</SMALL></SUB>|ΣC<SUB align="right"><SMALL>J</SMALL></SUB>). The research problem is formulated in form of two different mixed integer linear programming (MILP) models. Comparing...</small></sub></small></sub></small></sub>
Persistent link: https://www.econbiz.de/10010691803
Persistent link: https://www.econbiz.de/10010004572
This paper studies the problem of scheduling open shops with no intermediate buffer, called no-wait open shops under makespan minimization. No-wait scheduling problems arise in many realistic production environments such as hot metal rolling, the plastic molding, chemical and pharmaceutical,...
Persistent link: https://www.econbiz.de/10011076728
Persistent link: https://www.econbiz.de/10008329557
Persistent link: https://www.econbiz.de/10008253174
Persistent link: https://www.econbiz.de/10009978710
Persistent link: https://www.econbiz.de/10009163524
Persistent link: https://www.econbiz.de/10008900694
Persistent link: https://www.econbiz.de/10008286987
Persistent link: https://www.econbiz.de/10008890713