Showing 1 - 10 of 175
We develop a stochastic two-stage optimisation model that captures the multistage nature of electricity transmission planning under uncertainty and apply it to a stylised representation of the Great Britain (GB) network. In our model, a proactive transmission planner makes investment decisions...
Persistent link: https://www.econbiz.de/10008856425
Persistent link: https://www.econbiz.de/10008659219
Persistent link: https://www.econbiz.de/10009245226
Persistent link: https://www.econbiz.de/10011538949
Persistent link: https://www.econbiz.de/10011758165
This paper analyzes the effects of price differentiation and discrimination by a monopolistic transport operator, which sets fares in a congestible network. Using three models, with different spatial structures, we describe the operator's optimal strategies in an unregulated market, a market...
Persistent link: https://www.econbiz.de/10010384385
Persistent link: https://www.econbiz.de/10009724345
Persistent link: https://www.econbiz.de/10009724348
We compare three stochastic user equilibrium traffic assignment models (multinomial probit, nested logit, and generalized nested logit), using a congestible transport network. We test the models in two situations: one in which they have theoretically equivalent coefficients, and one in which...
Persistent link: https://www.econbiz.de/10010227315
Persistent link: https://www.econbiz.de/10010499608