Showing 11 - 20 of 128
Persistent link: https://www.econbiz.de/10001303158
Persistent link: https://www.econbiz.de/10001471629
Persistent link: https://www.econbiz.de/10001379220
Persistent link: https://www.econbiz.de/10012499576
Persistent link: https://www.econbiz.de/10004191570
Persistent link: https://www.econbiz.de/10014008451
In projects with a flexible project structure, the activities that have to be scheduled are not completely known beforehand. Instead, scheduling such a project includes the decision whether to carry out particular activities at all. This also effects precedence constraints between the finally...
Persistent link: https://www.econbiz.de/10010294420
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with...
Persistent link: https://www.econbiz.de/10011324714
This paper presents a generic modeling framework to simultaneously decide about production quantities and maintenance operations for a capacitated resource facing a dynamic demand for di erent types of products. As the resource needs to be setup for each speci c type of product, a lot-sizing...
Persistent link: https://www.econbiz.de/10010332632
The transportation processes for patients, personnel, and material in large and complex maximum-care hospitals with many departments can consume significant resources and thus induce substantial logistics costs. These costs are largely determined by the allocation of the different departments...
Persistent link: https://www.econbiz.de/10010352207