Showing 1 - 10 of 341
We study the order acceptance and scheduling problem in a two-machine flowshop. The firm receives a pool of orders before a planning period, each of which is characterized by revenue, processing times on machines 1 and 2, a due date, and a tardiness penalty. The firm seeks to decide on the...
Persistent link: https://www.econbiz.de/10010869209
Persistent link: https://www.econbiz.de/10010054469
We consider a two-stage make-to-order production system characterized by limited production capacity and tight order due dates. We want to make joint decisions on order acceptance and scheduling to maximize the total net revenue. The problem is computationally intractable. In view of the fact...
Persistent link: https://www.econbiz.de/10010594400
Persistent link: https://www.econbiz.de/10009685637
Persistent link: https://www.econbiz.de/10009685718
In this paper we study subcontracting price schemes between a subcontractor and a firm that are engaged in subcontracting of heterogeneous orders with distinct due dates, revenues, and processing times. We assume that the subcontractor proposes the subcontracting pricing and the firm follows by...
Persistent link: https://www.econbiz.de/10011264261
In this paper we study a scheduling model that simultaneously considers production scheduling, material supply, and product delivery. One vehicle with limited loading capacity transports unprocessed jobs from the supplier's warehouse to the factory in a fixed travelling time. Another capacitated...
Persistent link: https://www.econbiz.de/10005347493
Persistent link: https://www.econbiz.de/10006641742
Persistent link: https://www.econbiz.de/10008250541
Persistent link: https://www.econbiz.de/10008161162