Showing 21 - 30 of 174
This paper treats the problem of setting the inventory level of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a huge but simple linear program that models an entire simulation run of a closed-loop flow line in discrete time to determine a...
Persistent link: https://www.econbiz.de/10010270043
This paper treats the problem of setting the inventory level and optimizing the buffer allocation of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a very large but simple linear program that models an entire simulation run of a closed-loop flow...
Persistent link: https://www.econbiz.de/10010421360
We present a detailed analysis of the patient and resource scheduling problem in rehabilitation hospitals. In practice, the predominantly therapeutical treatments and activities which are prescribed for the patients are typically scheduled manually. This leads to rigid and inefficient schedules...
Persistent link: https://www.econbiz.de/10010289017
This paper treats the problem of setting the inventory level of closed-loop owlines operating under the constant-work-in-process (CONWIP) protocol. We solve ahuge but simple linear program that models an entire simulation run of a closed-loopow line in discrete time to determine a production...
Persistent link: https://www.econbiz.de/10005870770
We present a detailed analysis of the patient and resource scheduling problemin rehabilitation hospitals. In practice, the predominantly therapeutical treatmentsand activities which are prescribed for the patients are typically scheduled manually.This leads to rigid and inefficient schedules...
Persistent link: https://www.econbiz.de/10009302603
This paper presents a linear programming approach to analyze and optimizeow lines with limited buer capacities and stochastic processing times. The basic ideais to solve a huge but simple linear program that models an entire simulation run of amulti-stage production process in discrete time, to...
Persistent link: https://www.econbiz.de/10005867427
This paper treats the problem of setting the inventory level of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a huge but simple linear program that models an entire simulation run of a closed-loop flow line in discrete time to determine a...
Persistent link: https://www.econbiz.de/10003930858
We present a detailed analysis of the patient and resource scheduling problem in rehabilitation hospitals. In practice, the predominantly therapeutical treatments and activities which are prescribed for the patients are typically scheduled manually. This leads to rigid and inefficient schedules...
Persistent link: https://www.econbiz.de/10008906834
Persistent link: https://www.econbiz.de/10008823426
Persistent link: https://www.econbiz.de/10003511840