Showing 1 - 10 of 78
For a current deregulated power system, a large amount of operating reserve is often required to maintain the reliability of the power system using traditional approaches. In this paper, we propose a two-stage robust optimization model to address the network constrained unit commitment problem...
Persistent link: https://www.econbiz.de/10010871237
Persistent link: https://www.econbiz.de/10008857501
Persistent link: https://www.econbiz.de/10011932509
Persistent link: https://www.econbiz.de/10009355659
Persistent link: https://www.econbiz.de/10008780821
Persistent link: https://www.econbiz.de/10003766324
Persistent link: https://www.econbiz.de/10012631646
Persistent link: https://www.econbiz.de/10010187732
Persistent link: https://www.econbiz.de/10012294857
Persistent link: https://www.econbiz.de/10011777835