Showing 1 - 10 of 33,957
electricity-to-hydrogen-to-ammonia plant is derived in this paper. A heuristic is presented, which is able to translate the …
Persistent link: https://www.econbiz.de/10011117483
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011655297
Persistent link: https://www.econbiz.de/10003785607
Persistent link: https://www.econbiz.de/10003897065
Persistent link: https://www.econbiz.de/10008669655
Persistent link: https://www.econbiz.de/10003988966
Persistent link: https://www.econbiz.de/10003692414
Persistent link: https://www.econbiz.de/10011281724
Persistent link: https://www.econbiz.de/10011308776
Persistent link: https://www.econbiz.de/10010258180