Showing 1 - 10 of 708
In regional water management systems, various uncertainties may be derived from random feature of resource conditions and natural processes, errors in estimated modeling parameters, as well as imprecision or fuzziness human-induced. This leads to difficulties in formulating and solving the...
Persistent link: https://www.econbiz.de/10009249249
Persistent link: https://www.econbiz.de/10009030566
Greenhouse gas (GHG) concentrations are expected to continue to rise due to the ever-increasing use of fossil fuels and ever-boosting demand for energy. This leads to inevitable conflict between satisfying increasing energy demand and reducing GHG emissions. In this study, an integrated...
Persistent link: https://www.econbiz.de/10008916440
In this study, a two-stage inexact-stochastic programming (TISP) method is developed for planning carbon dioxide (CO2) emission trading under uncertainty. The developed TISP incorporates techniques of interval-parameter programming (IPP) and two-stage stochastic programming (TSP) within a...
Persistent link: https://www.econbiz.de/10008916514
In this study, an inexact fuzzy-stochastic energy model (IFS-EM) is developed for planning energy and environmental systems (EES) management under multiple uncertainties. In the IFS-EM, methods of interval parameter fuzzy linear programming (IFLP) and multistage stochastic programming with...
Persistent link: https://www.econbiz.de/10008917097
In this study, an interval-valued minimax regret analysis (IMRA) method is proposed for planning greenhouse gas (GHG) abatement under uncertainty. The IMRA method is a hybrid of interval-parameter programming (IPP) and minimax regret analysis (MMR) techniques. The developed method is applied to...
Persistent link: https://www.econbiz.de/10009142959
Persistent link: https://www.econbiz.de/10007718232
Agricultural nonpoint sources (NPS) pollution has long been regarded as the leading challenge in maintaining water quality of receiving water bodies. Effluent trading can serve as a cost-effective way to achieve optimal configuration of discharge permits in agricultural NPS pollution control....
Persistent link: https://www.econbiz.de/10011208810
In this study, a two-stage fuzzy robust integer programming (TFRIP) method has been developed for planning environmental management systems under uncertainty. This approach integrates techniques of robust programming and two-stage stochastic programming within a mixed integer linear programming...
Persistent link: https://www.econbiz.de/10005337260
In this study, a dual-interval vertex analysis (DIVA) method is developed, through incorporating the vertex method within an interval-parameter programming framework. The developed DIVA method can tackle uncertainties presented as dual intervals that exist in the objective function and the left-...
Persistent link: https://www.econbiz.de/10005023381