Showing 1 - 10 of 27
Time-cost tradeoff analysis is a very important issue in project management. The Kaufmann–Desbazeille algorithm is considered by numerous authors to be an exact algorithm to solve this problem. In the paper, we prove that this claim is not true. In particular, we perform a worst-case...
Persistent link: https://www.econbiz.de/10010684366
Time-cost tradeoff analysis is a very important issue in project management. The Kaufmann–Desbazeille algorithm is considered by numerous authors to be an exact algorithm to solve this problem. In the paper, we prove that this claim is not true. In particular, we perform a worst-case...
Persistent link: https://www.econbiz.de/10011131890
Persistent link: https://www.econbiz.de/10011347869
Persistent link: https://www.econbiz.de/10010437162
Persistent link: https://www.econbiz.de/10012613282
The goal programming (GP) is a well-known approach applied to multi-criteria decision making (M-DM). It has been used in many domains and the literature offers diverse extensions of this procedure. On the other hand, so far, some evident analogies between M-DM under certainty and scenario-based...
Persistent link: https://www.econbiz.de/10012388744
Persistent link: https://www.econbiz.de/10011965632
The assignment problem (AP) is a discrete and combinatorial problem where agents are assigned to perform tasks for efficiency maximization or cost (time) minimization. AP is a part of human resource project management (HRPM). The AP optimization model, with deterministic parameters describing...
Persistent link: https://www.econbiz.de/10012423149
Persistent link: https://www.econbiz.de/10012508669
Persistent link: https://www.econbiz.de/10011711551