Showing 1,171 - 1,180 of 1,228
Persistent link: https://www.econbiz.de/10009800137
Persistent link: https://www.econbiz.de/10009133061
Persistent link: https://www.econbiz.de/10008883674
In equipment-intensive industries such as truck, electronics, aircraft and dredging vessel manufacturing, service parts are often slow moving items for which, in some cases, the transshipment time is not negligible. However, this aspect is hardly considered in the existing service logistics...
Persistent link: https://www.econbiz.de/10014197521
Real-time railway operations are subject to stochastic disturbances. However, a railway timetable is a deterministic plan. Thus a timetable should be designed in such a way that it can cope with the stochastic disturbances as well as possible. For that purpose, a timetable usually contains time...
Persistent link: https://www.econbiz.de/10014053399
In this paper we verify the conditions under which the marginal cost approch of Berg holds. As observed by Aven and dekker the validity of the marginal cost approch gives rise to useful framework of single component maintenance optimization models which covers almost all models used in practice
Persistent link: https://www.econbiz.de/10014056080
Revenue management is the practice of selecting those customers that generate the maximum revenue from a fixed and perishable capacity. Cargo revenue management differs from the well-known passenger revenue management problem by the fact that its capacity constraint is 2-dimensional, i.e. weight...
Persistent link: https://www.econbiz.de/10014069563
In this paper we review the literature on multi-component maintenance models with economic dependence. The emphasis is on papers that appeared after 1991, but there is an overlap with Section 2 of the most recent review paper by Cho and Parlar (1991). The classification scheme that we choose is...
Persistent link: https://www.econbiz.de/10014070065
Demand for spare parts can sometimes be classified into critical and non-critical demand, depending on the criticality of the equipment in which it is installed. To effectively handle this situation in spare parts inventory control, we propose a stocking policy where some of the stock is...
Persistent link: https://www.econbiz.de/10014071616
Persistent link: https://www.econbiz.de/10014071619