Showing 71 - 80 of 1,352
Persistent link: https://www.econbiz.de/10014426303
Persistent link: https://www.econbiz.de/10014430418
Persistent link: https://www.econbiz.de/10014444879
Persistent link: https://www.econbiz.de/10014290441
Persistent link: https://www.econbiz.de/10014228541
Persistent link: https://www.econbiz.de/10013380876
This paper deals with large-scale crew scheduling problems arising at the Dutch railway operator, Netherlands Railways (NS). NS operates about 30,000 trains a week. All these trains need a driver and a certain number of conductors. No available crew scheduling algorithm can solve such huge...
Persistent link: https://www.econbiz.de/10004972185
When tracks are out of service for maintenance during a certain period, trains cannot be operated on those tracks. This leads to a modified timetable, and results in infeasible rolling stock and crew schedules. Therefore, these schedules need to be repaired. The topic of this paper is the...
Persistent link: https://www.econbiz.de/10004972202
In this paper we propose and analyze a variant of the level method [4], which is an algorithm for minimizing nonsmooth convex functions. The main work per iteration is spent on 1) minimizing a piecewise-linear model of the objective function and on 2) projecting onto the intersection of the...
Persistent link: https://www.econbiz.de/10005008186
The computational time required by interior-point methods is often dominated by the solution of linear systems of equations. An efficient specialized interior-point algorithm for primal block-angular problems has been used to solve these systems by combining Cholesky factorizations for the block...
Persistent link: https://www.econbiz.de/10010682483