Showing 31 - 40 of 24,971
Persistent link: https://www.econbiz.de/10012805003
Persistent link: https://www.econbiz.de/10012517639
Persistent link: https://www.econbiz.de/10012589656
Persistent link: https://www.econbiz.de/10013417035
Persistent link: https://www.econbiz.de/10013415887
Persistent link: https://www.econbiz.de/10014280020
Persistent link: https://www.econbiz.de/10014304621
Persistent link: https://www.econbiz.de/10013373087
model is implemented for calculating river discharge under climate-change conditions. Reservoir simulation and optimization … calculated using simulation (standard operating policy) and optimization models in the considered periods. Our results show that …, respectively. Moreover, the hydropower production obtained with the optimization model is found to be larger than that obtained …
Persistent link: https://www.econbiz.de/10011151799
transition probabilities. Our approach is based on an optimization model. More specifically we consider two competing objectives …
Persistent link: https://www.econbiz.de/10011259232