Showing 231 - 240 of 29,251
In December 1987, Central Maine Power (CMP) instituted the first competitive bidding program that allowed developers to propose installation of conservation measures. Since then, about 30 utilities in 14 states have solicited bids from energy service companies (ESCOs) and customers to reduce...
Persistent link: https://www.econbiz.de/10009436201
reduced. When DOWS are used, additional oil may be recovered as well. In cases where surface processing or disposal capacity …
Persistent link: https://www.econbiz.de/10009436217
Disruptions in the supply of strategic resources or other crucial factor inputs often present significant problems for planners and policymakers. The problem may be particularly significant at the regional level where higher levels of product specialization mean supply restrictions are more...
Persistent link: https://www.econbiz.de/10009436238
degrading way, (2) eliminates the need to build significant amounts of new fossil-fueled, electric generating capacity, saving …
Persistent link: https://www.econbiz.de/10009436245
grid-connected applications. With 335 MW of grid-connected PV capacity added in 2009, the United States was the world … installed at end-use customer facilities (herein referred to as 'customer-sited' systems). The combined capacity of systems in … the data sample totals 874 MW, equal to 70% of all grid-connected PV capacity installed in the United States through 2009 …
Persistent link: https://www.econbiz.de/10009436285
capacity expansion in the U.S. Collectively, these policies now apply to almost 40% of U.S. electricity load, and may have …
Persistent link: https://www.econbiz.de/10009436300
business fundamentals such as site selection, projected customer counts, peak and off-peak fueling capacity needs and total …
Persistent link: https://www.econbiz.de/10009436328
capacity expansion in the U.S. Collectively, these policies now apply to roughly 40% of U.S. electricity load, and may have …
Persistent link: https://www.econbiz.de/10009436366
any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues …. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, then additional conservation …
Persistent link: https://www.econbiz.de/10009436418
capacity and energy). Qualifying facilities (QF) include solar or geothermal electric units, hydropower, municipal solid waste … to provide ''demonstrated'' capacity. Legislation was also enacted which allows PURPA to work effectively. Initial laws … of Washington, 20 small-scale hydroelectric projects with a combined generating capacity of 77 MW, 3 solid waste …
Persistent link: https://www.econbiz.de/10009436428