Showing 11 - 13 of 13
The consortium responsible for the next stage of development of the OWEL wave energy converter will construct and test a large scale, pre-commercial demonstrator. It is expected that this will be installed at Wave Hub during 2013 and grid connected for a testing period lasting around 12 months....
Persistent link: https://www.econbiz.de/10010806304
The uncertainty in estimates of the energy yield from a wave energy converter (WEC) is considered. The study is presented in two articles. The first article considered the accuracy of the historic data and the second article, presented here, considers the uncertainty which arises from...
Persistent link: https://www.econbiz.de/10010803937
In the last decade, the development of photovoltaic roofing elements has been exceptional. These efforts were not limited to merely improving the integration methods with standard PV products but were also directed towards the production of appropriate elements that could replace roof tiles or...
Persistent link: https://www.econbiz.de/10010804482