The concept of partially renewable resources provides a general modeling framework that can be used for a wide range of different real-life applications. In this paper, we consider a resource-constrained project duration problem with partially renewable resources, where the temporal constraints...
Persistent link: https://www.econbiz.de/10014497492
In this paper, we consider the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints. For the first time, the concept of partially renewable resources is embedded in the context of projects with general temporal constraints. While...
Persistent link: https://www.econbiz.de/10014503793
Persistent link: https://www.econbiz.de/10012419318
This paper deals with the generalized resource-constrained project scheduling problem (GRCPSP) which extends the well-known resource-constrained project scheduling problem (RCPSP) by considering job specific release and due dates, non-negative minimum start-to-start time lags as well as...
Persistent link: https://www.econbiz.de/10010950224
Resource-constrained project scheduling under a net present value objective attracts growing interest. Because this is an NP-hard problem, it is unlikely that optimum solutions can be computed for large instances. Thus, heuristics have become a popular research field. Up to now, however, tight...
Persistent link: https://www.econbiz.de/10011558745
Complexity proofs often restrict themselves to stating that the problem at hand is a generalization of some other intractable problem, This proof technique relies on the widely accepted assumptions that complexity results hold regardless of the model formulation used to represent the problem and...
Persistent link: https://www.econbiz.de/10011594619
NP-completeness and other complexity proofs often merely State that the problem at hand is a generalization of some other intractable problem. This proof technique relies on the widely accepted assumption that complexity results hold regardless of the model formulation used to represent the...
Persistent link: https://www.econbiz.de/10011594620
We consider the resource-constrained project scheduling problem (RCPSP). The focus of the paper is on a formal definition of semi-active, active, and non-delay schedules. Traditionally these schedules establish basic concepts within the job shop scheduling literature. There they are usually...
Persistent link: https://www.econbiz.de/10011613723
We consider the classical resource-constrained project scheduling problem (RCPSP). The paper gives a detailed algorithmic description and provides theoretical results on two widely known problem specific heuristics: The serial and the parallel scheduling scheme. An in-depth computational study...
Persistent link: https://www.econbiz.de/10011613743