Showing 91 - 100 of 168
This paper treats the problem of setting the inventory level of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a huge but simple linear program that models an entire simulation run of a closed-loop flow line in discrete time to determine a...
Persistent link: https://www.econbiz.de/10010270043
This paper treats the problem of setting the inventory level and optimizing the buffer allocation of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a very large but simple linear program that models an entire simulation run of a closed-loop flow...
Persistent link: https://www.econbiz.de/10009447465
This paper treats the problem of setting the inventory level of closed-loop owlines operating under the constant-work-in-process (CONWIP) protocol. We solve ahuge but simple linear program that models an entire simulation run of a closed-loopow line in discrete time to determine a production...
Persistent link: https://www.econbiz.de/10005870770
This paper treats the problem of setting the inventory level of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a huge but simple linear program that models an entire simulation run of a closed-loop flow line in discrete time to determine a...
Persistent link: https://www.econbiz.de/10008556631
In this paper, we analyze the performance of call centers of financial service providers with two levels of support and a time-dependent overflow mechanism. Waiting calls from the front-office queue flow over to the back office, if a waiting-time limit is reached and at least one back-office...
Persistent link: https://www.econbiz.de/10005138910
This paper presents a linear programming approach to analyze and optimize flow lines with limited buffer capacities and stochastic processing times. The basic idea is to solve a huge but simple linear program that models an entire simulation run of a multi-stage production process in discrete...
Persistent link: https://www.econbiz.de/10005464765
This paper analyzes the Steiner-Weber-Problem with piecewise linear or piecewise constant transportation costs. These non-differentiable cost functions are analyzed using different one-step and dynamic linearization methods, which are based on approximations via average and marginal costs. An...
Persistent link: https://www.econbiz.de/10005464768
This paper proposes a new approach for the time-dependent analysis of stochastic and non-stationary queueing systems. The analysis of a series of stationary queueing models leads to a new approximation of time-dependent performance measures. Based on a stationary backlog-carryover (SBC)...
Persistent link: https://www.econbiz.de/10005253477
This paper treats the problem of setting the inventory level and optimizing the buffer allocation of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a very large but simple linear program that models an entire simulation run of a closed-loop flow...
Persistent link: https://www.econbiz.de/10010421360
In this paper, we analyze the performance of call centers of financial serviceproviders with two levels of support and a time-dependent overflow mechanism.Waiting calls from the front-office queue flow over to the back office, if a waiting-timelimit is reached and at least one back-office agent...
Persistent link: https://www.econbiz.de/10005867420