Showing 1 - 10 of 106,015
volatility control strategies and volatility target approaches to investment have gained a lot of interest as strategies able to … which no optimization is considered. In this contribution we focus on the role of volatility in downside risk reduction and … target volatility approach, into a multiperiod portfolio optimization model, through the introduction of a local volatility …
Persistent link: https://www.econbiz.de/10013044390
Persistent link: https://www.econbiz.de/10011632160
Persistent link: https://www.econbiz.de/10012053148
Bidding of flexible reservoir hydropower in day-ahead (spot) auctions needs to be done under uncertainty of electricity prices and inflow to reservoirs. The presence of reservoirs also means that the short-term problem of determining bids for the next 12–36 hours is a part of a long term...
Persistent link: https://www.econbiz.de/10011259663
Renewable energies are meant to produce a large share of the future electricity demand. However, the availability of wind and solar power depends on local weather conditions and therefore weather characteristics must be considered when optimizing the future electricity mix. In this article we...
Persistent link: https://www.econbiz.de/10010312745
Renewable energies are meant to produce a large share of the future electricity demand. However, the availability of wind and solar power depends on local weather conditions and therefore weather characteristics must be considered when optimizing the future electricity mix. <p>In this article we...</p>
Persistent link: https://www.econbiz.de/10009392980
In this contribution we propose an approach to solve a multistage stochastic programming problem which allows us to obtain a time and nodal decomposition of the original problem. This double decomposition is achieved applying a discrete time optimal control formulation to the original stochastic...
Persistent link: https://www.econbiz.de/10009644995
We propose a decomposition method for the solution of a dynamic portfolio optimization problem which fits the formulation of a multistage stochastic programming problem. The method allows to obtain time and nodal decomposition of the problem in its arborescent formulation applying a discrete...
Persistent link: https://www.econbiz.de/10005125637
The recent crisis made it evident that replicating the performance of a benchmark is not a sufficient goal to meet the expectations of usually risk-averse investors. The manager should also consider that the investor are seeking for a downside protection when the benchmark performs poorly and...
Persistent link: https://www.econbiz.de/10010559986
M-PRESS-CreditRisk is a new top-down macro stress testing framework that can help supervisors gauge banks' capital adequacy related to credit risk. For the first time, it combines calibration of microprudential capital requirements and macroprudential buffers in a unified, coherent framework....
Persistent link: https://www.econbiz.de/10011663208