Showing 11 - 20 of 640,448
This paper treats the problem of setting the inventory level of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a huge but simple linear program that models an entire simulation run of a closed-loop flow line in discrete time to determine a...
Persistent link: https://www.econbiz.de/10003930858
Persistent link: https://www.econbiz.de/10010383919
Persistent link: https://www.econbiz.de/10010366188
Persistent link: https://www.econbiz.de/10011437961
Persistent link: https://www.econbiz.de/10011565850
Persistent link: https://www.econbiz.de/10010437955
Persistent link: https://www.econbiz.de/10009679285
Persistent link: https://www.econbiz.de/10009682513
Persistent link: https://www.econbiz.de/10001859547
Persistent link: https://www.econbiz.de/10001437690