Showing 21 - 30 of 564
Produktionsplanungs- und -steuerungssysteme (PPS-Systeme) haben in den letzten Jahren in der wissenschaftlichen Literatur und der betrieblichen Praxis starke Beachtung gefunden. Während diese Systeme die Problematik der (Groß-) Serienfertigung (einigermaßen) bewältigen, sind sie für die...
Persistent link: https://www.econbiz.de/10011737975
The paper describes an algorithm for the generation of a general class of precedence- and resource-constrained scheduling problems. Easy and hard instances for the single- and multi-mode resource-constrained project scheduling problem are benchmarked by using the state of the art...
Persistent link: https://www.econbiz.de/10011738589
We consider the resource-constrained project scheduling problem (RCPSP). The focus of the paper is on a formal definition of semi-active, active, and non-delay schedules. Traditionally these schedules establish basic concepts within the job shop scheduling literature. There they are usually...
Persistent link: https://www.econbiz.de/10011738660
In machine tool assembly several make-to-order products have to be manufactured simultaneously in a multi-stage production system. Due to customer requirements batches are very small. A process plan specifies the neccessary machines, tools, auxiliary devices as well as the operations to be...
Persistent link: https://www.econbiz.de/10011739678
In this paper we propose a new heuristic to solve the well-known multiple resource-constrained project scheduling problem. The method is basically a biased random sampling procedure which shows extremely good results by use of the following features: A problem-based selection of the solution...
Persistent link: https://www.econbiz.de/10011743188
This paper addresses a general class of nonpreemptive resource-constrained project scheduling problems in which activity durations are discrete functions of committed renewable and nonrenewabe resources. We provide a 0-1 problem formulation and stress the importance of the outlined model by...
Persistent link: https://www.econbiz.de/10011743260
This paper describes recents developments in computer-based project-scheduling. The focus is on the resource-constrained project scheduling problem, a backbone-model of Software packages for project management. Based on a parametric characterisation of instances we provide new methods, which...
Persistent link: https://www.econbiz.de/10011743914
Persistent link: https://www.econbiz.de/10005151875
This paper addresses the issue of how to generate problem instances of controlled difficulty. It focuses on precedence- and resource-constrained (project) scheduling problems, but similar ideas may be applied to other network optimization problems. It describes a network construction procedure...
Persistent link: https://www.econbiz.de/10009204340
Persistent link: https://www.econbiz.de/10006096752