Showing 1 - 10 of 43,659
comparable to sophisticated optimization techniques. Research limitations/implications: The simulation based crashing method …Purpose: The time-cost trade-off problem addressed by CPM-based analytical approaches, assume unlimited resources and … selection problem in the project management. This problem is known to be NP-hard. Sophisticated optimization techniques such as …
Persistent link: https://www.econbiz.de/10011899949
Persistent link: https://www.econbiz.de/10012630737
Persistent link: https://www.econbiz.de/10011778002
Persistent link: https://www.econbiz.de/10011644364
Persistent link: https://www.econbiz.de/10011671461
Persistent link: https://www.econbiz.de/10011659002
Persistent link: https://www.econbiz.de/10011484705
Persistent link: https://www.econbiz.de/10011295853
Repetitive projects involve the repetition of activities along the stages of the project. Since the resources required to perform these activities move from one stage to the other, a main objective of scheduling these projects is to maintain the continuity of work of these resources so as to...
Persistent link: https://www.econbiz.de/10004982871
Recently, time-switch constraints have been introduced in the literature by Yang and Chen (2000). Basically, these constraints impose a specified starting time on the project activities and force them to be inactive during specified time periods. This type of constraints have been incorporated...
Persistent link: https://www.econbiz.de/10004983031