Chung, Tsui-Ping; Liao, Ching-Jong; Su, Ling-Huey - In: International Journal of Production Economics 123 (2010) 1, pp. 179-186
In the scheduling literature, it is often assumed that jobs arrive either simultaneously or individually. However, this assumption is invalid in most practical situations because jobs usually arrive in batches, e.g., the final testing house in the manufacturing of semiconductor. The concept of...