Showing 21 - 28 of 28
Persistent link: https://www.econbiz.de/10009289983
Persistent link: https://www.econbiz.de/10008891287
Persistent link: https://www.econbiz.de/10008895250
Persistent link: https://www.econbiz.de/10008172905
Persistent link: https://www.econbiz.de/10008445067
This study addresses a two-stage flowshop with a batch machine in stage 1 and a discrete machine in stage 2, subject to the constraint that the input buffer of the discrete machine can only host limited number of jobs. The batch machine processes a batch of jobs simultaneously, and the discrete...
Persistent link: https://www.econbiz.de/10008490591
In the scheduling literature, it is often assumed that jobs arrive either simultaneously or individually. However, this assumption is invalid in most practical situations because jobs usually arrive in batches, e.g., the final testing house in the manufacturing of semiconductor. The concept of...
Persistent link: https://www.econbiz.de/10008521497
Persistent link: https://www.econbiz.de/10010062147