Showing 61 - 70 of 9,978
Purpose: Time and Space assembly line balancing problem (TSALBP) is the problem of balancing the line taking the area required by the task and to store the tools into consideration. This area is important to be considered to minimize unplanned traveling distance by the workers and consequently...
Persistent link: https://www.econbiz.de/10012814907
Persistent link: https://www.econbiz.de/10012484630
Persistent link: https://www.econbiz.de/10012439577
Persistent link: https://www.econbiz.de/10012151719
Persistent link: https://www.econbiz.de/10012200599
Persistent link: https://www.econbiz.de/10012200648
Persistent link: https://www.econbiz.de/10011787456
Persistent link: https://www.econbiz.de/10011870708
Persistent link: https://www.econbiz.de/10014575589
Traditionally, assembly lines are laid out in a straight-line configuration where a worker covers only adjacent … performance of U-line and straight-line layouts. Several analytical and simulation results are presented, and insights are … provided to explain the difference in the performance of U-line and straight-line layouts. To summarize our main results …
Persistent link: https://www.econbiz.de/10009218761