Showing 1 - 10 of 646,382
joint impacts of backlogging, service level, stochastic breakdown, and scrap on the optimal runtime decision are revealed … satisfaction and goodwill. To cope with this unwanted result, a maximal permitted backlogging level is set as an operating … constraint to achieve the minimum required service level. Also, production of scrap items and stochastic breakdown are both …
Persistent link: https://www.econbiz.de/10012662770
Persistent link: https://www.econbiz.de/10012625792
Persistent link: https://www.econbiz.de/10010500772
Persistent link: https://www.econbiz.de/10011588114
Persistent link: https://www.econbiz.de/10011673545
Persistent link: https://www.econbiz.de/10011877073
Persistent link: https://www.econbiz.de/10012197898
Persistent link: https://www.econbiz.de/10014546415
Persistent link: https://www.econbiz.de/10015060775
Persistent link: https://www.econbiz.de/10010347405