Showing 61 - 70 of 2,498
Persistent link: https://www.econbiz.de/10014292841
We study a scheduling problem with rejection on a single serial batching machine, where the objectives are to minimize the total completion time and the total rejection cost. We consider four different problem variations. The first is to minimize the sum of the two objectives. The second and the...
Persistent link: https://www.econbiz.de/10010709936
We present an effective scheduling heuristic for realistic production planning in a petrochemical blending plant? The considered model takes into account orders spanning a multi-product portfolio with multiple bills of materials per product, that need to be scheduled on shared production...
Persistent link: https://www.econbiz.de/10011122255
We consider the problem of minimizing the makespan on a batch processing machine, in which jobs are not all compatible …
Persistent link: https://www.econbiz.de/10010759292
Persistent link: https://www.econbiz.de/10011917150
In this paper, we consider Kumaraswamy-G distributions and derive a Uniformly Minimum Variance Unbiased Estimator (UMVUE) and a Maximum Likelihood Estimator (MLE) of the two measures of reliability, namely R(t) = P(X t) and P = P(X Y ) under Type II censoring scheme and sampling scheme of...
Persistent link: https://www.econbiz.de/10013444124
We consider estimation and inference for a regression coefficient in panels with interactive fixed effects (i.e., with a factor structure). We show that previously developed estimators and confidence intervals (CIs) might be heavily biased and size-distorted when some of the factors are weak. We...
Persistent link: https://www.econbiz.de/10014480692
Persistent link: https://www.econbiz.de/10000617933
Persistent link: https://www.econbiz.de/10009576368
Persistent link: https://www.econbiz.de/10011398079