Showing 1 - 10 of 280
Persistent link: https://www.econbiz.de/10001456859
Persistent link: https://www.econbiz.de/10007600804
Persistent link: https://www.econbiz.de/10006235155
Persistent link: https://www.econbiz.de/10003867584
Persistent link: https://www.econbiz.de/10001692940
Persistent link: https://www.econbiz.de/10002025439
<Para ID="Par1">In the past the flood design was dominated by safety oriented concepts. A design flood was chosen with the basic assumption that it defines the limit up to which a flood can be controlled completely by technical measures. Often peak values with very small probabilities are used. Thus the risk of...</para>
Persistent link: https://www.econbiz.de/10011151736
Persistent link: https://www.econbiz.de/10003775932
Persistent link: https://www.econbiz.de/10003822431