Showing 31 - 40 of 460
Persistent link: https://www.econbiz.de/10011759664
Persistent link: https://www.econbiz.de/10013461691
We consider a make-to-stock, finite-capacity production system with setup cost and delay-sensitive customers. To balance the setup and inventory related costs, the production manager adopts a two-critical-number control policy, where the production starts when the number of waiting customers...
Persistent link: https://www.econbiz.de/10013015115
Persistent link: https://www.econbiz.de/10010108703
Persistent link: https://www.econbiz.de/10012096288
Persistent link: https://www.econbiz.de/10012192674
Persistent link: https://www.econbiz.de/10012810597
Persistent link: https://www.econbiz.de/10012810625
Consider a single-server service system with uncertain quality level (which is assumed to be binary). Both the server and the customers know the distribution of quality levels and are engaged in the following two-stage game. In the first stage, the server commits to a strategy (possibly mixed)...
Persistent link: https://www.econbiz.de/10012834252
Persistent link: https://www.econbiz.de/10012904344