We establish the computational complexity of the problem of minimizing makespan in a flowshop, where each jobs requires a pallet the entire time, from the start of its first operation until the completion of the last operation. We prove that the problem is NP-hard in the strong sense for m =2...
Persistent link: https://www.econbiz.de/10013152472
We consider the problem of scheduling n jobs in a pallet-constrained two-machine flowshop so as to minimize the makespan. In such a flowshop environment, each job needs a pallet the entire time, from the start of its first operation until the completion of the last operation, and the number of...
Persistent link: https://www.econbiz.de/10014211244
Flow shop scheduling is common in modern lean production systems. In practice, jobs in flow shops can arrive at irregular times. However, scheduling that considers such irregularity has not been adequately investigated in the literature. In this paper, we examine the scheduling of n-jobs in an...
Persistent link: https://www.econbiz.de/10012838801
We study the problem of scheduling a chain-reentrant shop, in which each job goes for its processing first to a machine called the primary machine, then to a number of other machines in a fixed sequence, and finally back to the primary machine for its last operation. The problem is to schedule...
Persistent link: https://www.econbiz.de/10014218590
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011655297
Job shop scheduling with a bank of machines in parallel is important from both theoretical and practical points of review. Here we focus on a flexible job shop scheduling problem of minimizing the makespan in a two-center job shop, where the first center consists of one machine and the second...
Persistent link: https://www.econbiz.de/10012838656
This paper presents a simple Optimised Search Heuristic for the Job Shop Scheduling problem that combines a GRASP heuristic with a branch-and-bound algorithm. The proposed method is compared with similar approaches and leads to better results in terms of solution quality and computing times
Persistent link: https://www.econbiz.de/10012775941
smaller size problems. For larger problems, solutions obtained by different heuristics are compared against each other. All of …
Persistent link: https://www.econbiz.de/10014097801
We consider the scheduling problem of cyclic production in a bufferless dual-gripper robot cell processing a family of identical parts. The objective is to find an optimal sequence of robot moves so as to maximize the long-run average throughput rate of the cell. While there has been a...
Persistent link: https://www.econbiz.de/10012750229
We propose a model where customers are classified into two groups: short lead-time customers who require the product immediately and long lead-time customers to whom the supplier may deliver either immediately or in the next cycle. Unmet orders are backlogged with associated costs. Specifically,...
Persistent link: https://www.econbiz.de/10012838119