We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011655297
This paper calls for a change in paradigm in lot sizing and scheduling. Traditionally, a discrete time scale is chosen to model lot sizing and scheduling. As an alternative, the so-called block planning concept is proposed which is based on a continuous representation of time. A mixed-integer...
Persistent link: https://www.econbiz.de/10010414317
Scheduling methods are proposed for a class of flexible manufacturing systems consisting of machine centers served by a cyclic conveyor. The minimization of finish time is considered as the optimization criterion. An optimal algorithm is proposed for the minimum conveyor speed (S = 1) for a...
Persistent link: https://www.econbiz.de/10012834910
The optimal production control problem of deterministic pull flow lines with multiple part types is considered in this paper. The last machine is assumed to be the bottleneck. The objective is to minimize the total inventory and backlog costs over time. We give an optimal production policy and...
Persistent link: https://www.econbiz.de/10012835295
The paper is concerned with the problem of optimal production planning in deterministic pull flow lines with multiple products. The objective is to specify the production policy that minimizes the total inventory and backlog costs overtime. Assuming constant product demands and non-decreasing...
Persistent link: https://www.econbiz.de/10012772150
This paper is concerned with an asymptotic analysis of hierarchical production and setup scheduling in a stochastic manufacturing system consisting of a single failure-prone machine and facing constant demands for a number of products. At any given time the system can only produce one type of...
Persistent link: https://www.econbiz.de/10014046909
This paper presents an asymptotic analysis of hierarchical production planning in a manufacturing system with two tandem machines that are subject to breakdown and repair. The system produces a single product, whose rate of demand over time is given to be constant. The problem is formulated as a...
Persistent link: https://www.econbiz.de/10014046910
In a recent paper, Fisher et al. (2001) present a method tomitigate end-effects in lot sizing by including a valuation term for end-of-horizon inventory in the objective function of the short-horizon model. Computational tests show that the proposed method outperforms the Wagner-Whitin algorithm...
Persistent link: https://www.econbiz.de/10014033650
We establish the computational complexity of the problem of minimizing makespan in a flowshop, where each jobs requires a pallet the entire time, from the start of its first operation until the completion of the last operation. We prove that the problem is NP-hard in the strong sense for m =2...
Persistent link: https://www.econbiz.de/10013152472
Job shop scheduling with a bank of machines in parallel is important from both theoretical and practical points of review. Here we focus on a flexible job shop scheduling problem of minimizing the makespan in a two-center job shop, where the first center consists of one machine and the second...
Persistent link: https://www.econbiz.de/10012838656